They are trying to hide the truth: the occupiers are delaying the launch of the Crimean bridge

After the explosions on the bridge on October 8, the Rashists promised “Restore“illegal construction in”shortest terms”, citing various dates in the fall of 2022. Although it was obvious that the amount of damage was much greater than the propaganda of the Russian invaders claimed. Now the aggressors claim that allegedly “high construction rates“allowed”move the scheduled opening date of the damaged bridge crossing to December 20, 2022″, trying to present it as a “remarkable success“, reports the Association for the Reintegration of Crimea.

At the same time, the occupiers finally admitted that the railway part of the building was “thermally affected” and promised to replace the railway sections “next year“.

In fact, the invaders are not able to carry out such work during the autumn-winter period on the thirty-meter height of the bridge, but at the same time they explain the delay with “lack of urgent need”. It said that “the railway branch of the bridge is now in full operation with train speed restrictions” and that there is no danger of collapse in the near term.

At the same time, most experts note that after the explosions of the Crimean bridge, its railway capacity has significantly decreased, which directly affects the military logistics of the aggressor. These events are connected not only with the attempt of the occupiers to create an illegal “land corridor” for motor vehicles through the occupied Melitopol, but also with the convulsive and unsuccessful attempts of the aggressor to “repulse” the Armed Forces of Ukraine from areas of the Donetsk region, near the “alternative” railway line to Crimea via Volnovakha, Komish-Zorya and Melitopol. Separate experts of the occupiers admit that the road and rail link through the “land corridor” through Melitopol is now objectively within the range of missile weapons from the right bank of the Dnieper. At the same time, they claim that this corridor supposedly “does not contain infrastructure facilities” vulnerable to explosions and shelling.

At the same time, Ukrainian experts emphasize, the Rashists prefer not to mention the bridges in the Sivasha region, as well as a number of other interesting objects from the “land corridor” in the occupied part of the Zaporozhye region.

We recall that the head of the Main Directorate of Intelligence of the Ministry of Defense of Ukraine, Kyrylo Budanov, said that the symbol of “Russian peace” the Kerch bridge will be destroyed.

419

Read us on the Telegram channel, Facebook and Instagram

.

Leave a Comment

Your email address will not be published. Required fields are marked *